The VEERUM Impact

Real world results from real clients

  • Design productivity improvements

    15%

  • Realized engineering cost savings

    50%

  • Reduced wellhead capital cost

    30%

Simple Implementation of VisOps for Construction Sites

Your team's workspace for operational success.

Optimize your project with real-time monitoring and actionable insights

Image of design files being used in a digital twin for construction progress visualization.

Getting started with VEERUM for VisOps is easier than you think!

  • Import design files (2D/3D CAD)
  • Digitize and import site reality
  • Integrate engineering, business, and operations systems
  • Train your team around the world

Ask us how

Image of design files being used in a digital twin for construction progress visualization.

Ready for your 3D digital site

Image of UAV overflight scan visualized in digital twin software.

Using your design models and reality capture data, we can build the foundation of your reality-site in just a few days.

Simply upload your existing photogrammetry, drone imagery, scans, 360° panoramic photos, terrestrial scans, and mobile mapping data to VEERUM to get started.

Image of UAV overflight scan visualized in digital twin software.

Teams can monitor and collaborate remotely, reducing costs and field exposure.

VEERUM's visualizations engine has helped us gain insights into complex issues including ground movement, site grading and drainage. It has saved us countless visits to site.
PEng, BHP
Benefits of VEERUM for VisOps

Reap the benefits of near real-time digitally verified progress monitoring

Enhance project visibility and control

Color coded image showing areas in and out of tolerance as part of construction progress visualization.

The VisOps reality-site allows users to track construction progress in real-time, leading to better oversight and control. Digital identification of completed work provides visualization within 48 hours.

Color coded image showing areas in and out of tolerance as part of construction progress visualization.

Increase workfront efficiency

Color coded industrial asset image showing areas installed and not installed as part of construction progress visualization.

Reduce the need for on site visits and multiple system analysis to make better decisions

Enable better workfront management with real time data visualized in 3D to determine material availability and completions activities.

Color coded industrial asset image showing areas installed and not installed as part of construction progress visualization.

Improve quality and reduce costs

Image of color coded asset in a digital twin identifying defects, and incomplete work during industrial construction.

Enable digital identification of quality issues without on site physical inspection

Reduce rework and delays by identifying and rectifying issues early in the virtual model.

Image of color coded asset in a digital twin identifying defects, and incomplete work during industrial construction.

Enhance risk management

Image showing early detection of potential issues labelled 'near misses' during construction progress visualization.

Early detection of potential issues allows for prompt mitigation.

Continuous monitoring helps identify safety hazards proactively, improving worker safety.

Image showing early detection of potential issues labelled 'near misses' during construction progress visualization.

Improve collaboration

Image of user comments in the digital twin while visualizing construction progress collaboratively.

Remote access allows all team members to work with the same data, enhancing collaboration.

Real-time updates keep all stakeholders informed and involved.

Image of user comments in the digital twin while visualizing construction progress collaboratively.

Enhance data-driven decision making

Image of chart of construction progress visualization report in VEERUM of installed progress.

Aggregated data from various sources provides comprehensive insights, leading to better decisions.

Quickly and easily visualize, measure and analyze key performance indicators (KPIs) like productivity, progress, and quality.

Image of chart of construction progress visualization report in VEERUM of installed progress.

Improve sustainability and compliance

Color coded image of terrain in a digital twin enables enhanced environmental compliance at a petrochemicals facility.

Optimized resource use and reduced waste contribute to sustainability goals.

Detailed documentation and real-time tracking ensure compliance with regulations and standards.

Color coded image of terrain in a digital twin enables enhanced environmental compliance at a petrochemicals facility.

Improve project documentation and maintenance of historical data

Image of chart of progress metrics at an industrial site within the digital twin.

VEERUM maintains a thorough history of the construction process, useful for future reference and maintenance.

Historical data helps in benchmarking and improving future projects.

Image of chart of progress metrics at an industrial site within the digital twin.

Increase stakeholder confidence and satisfaction

Color coded scan of valve in the a digital twin with stakeholder note to check valve alignment.

Clear, real-time updates enhance trust and satisfaction among clients and stakeholders.

Improve project quality through accurate and timely interventions.

Color coded scan of valve in the a digital twin with stakeholder note to check valve alignment.