Remove hundreds to thousands of hours of field visits
Virtual fit-ups eliminate hundreds to thousands of hours of site visits
By comparing as-built to as-modeled environments in a virtual install, VEERUM clients can easily identify misalignments and intolerances in design and resolve them prior to physically encountering them in the field, saving hundreds to thousands of field hours, rework, and delays.
Site visits come with many challenges
Travel to site and time on-site is part of doing business, but both come at a cost.
- Accumulated travel, accommodation, and time expenses raise overall project costs
- Frequent trips lead to delays, reducing productive work time
- Siloed data, and lack of real-time data, make efficient planning harder
- Miscommunication among team members can lead to errors
- More on-site presence increases exposure to safety hazards
- Frequent travel contributes to a higher carbon footprint
Clients reported reducing travel to site by 28% in the first year of using VEERUM... while reducing 35% of field exposure hours.
VEERUM significantly reduces the need to travel to site
Visit your site 24/7 in an immersive, interactive, and accurate 3D environment
Remote access to site
- Real-Time data: VEERUM allows users to view current site conditions virtually, allowing teams to monitor progress and address issues remotely
- Accessibility: Stakeholders can access data from anywhere, eliminating the need for frequent site visits to gather information
Enhanced safety
- Reduced field exposure: By minimizing the number of personnel on-site, the reality-site lowers the risk of accidents and exposure to hazardous conditions
- Virtual inspections: Teams can conduct inspections and assessments virtually, maintaining safety while still ensuring quality control
Cost efficiency
- Travel savings: Fewer site visits lead to significant reductions in travel expenses, allowing resources to be allocated more effectively
- Time savings: By decreasing the time spent on-site, teams can focus on critical tasks, accelerating project timelines and increasing productivity
We use VEERUM for turnaround clash protection. Some pieces in the as-built are not in the as-modeled environment. We can resolve those clashes prior to physically encountering them in the field. If we were to experience these fit-up delays during the turnaround, the impact is almost incalculable.
Key outcomes
VEERUM minimizes site visits caused by design misalignment and inaccuracies
VEERUM ensures that site visits due to misalignment and inaccuracies in design are minimized, delivering primary safety benefits and significant cost savings to its users.
Primary safety benefit:
- Digital verification reduces the risk of safety incidents by eliminating unplanned work, which causes stress and unsafe decisions
- This prevents potential safety hazards during future maintenance activities
Secondary cost benefit:
- Digital verification ensures seamless execution and avoids days and weeks of schedule extensions required for unplanned work
100-200 hour reduction in field exposure hours
Client case study outcomes
- Estimated cost savings included 100-200 hours of on-site work, equipment and overtime
- Avoided lost production of approximately 90,000 barrels per day if an outage occurred in the remaining pumphouse trains during the shutdown
VEERUM can do the same for you. Talk to an expert.
We’re here to understand your needs, answer your questions, and give you a quick platform tour.
- Get expert advice
- Walkthrough case studies
- Onboarding plan